Capacity Calculator
Size Your Deployment
A reference estimate for your team’s planning. We’ll follow up with a precision quote tailored to site, workload, and timing.
Your deployment
Adjust the inputs. Numbers update live.
50
11,500
Total Power
3.44 MW
3,445 kW facility load
Annualized PUE
1.06
Among the lowest in operation
Annual Energy
25,651 MWh
At 85% utilization
Estimated Annual Cost
$1,026,059
At KSA reference rate $0.04/kWh
Our recommendation
Based on your inputs, we recommend a deployment of immersion-cooled pods with N+1 power architecture.
Carbon comparison · annual
At a NanoLite (KSA grid mix)16,673 t CO₂e
If deployed at a US average facility10,261 t CO₂e
If deployed at an EU average facility6,413 t CO₂e
Reference grid factors. KSA factor improves as renewable integration scales through 2029.
Reference estimate for planning. We respond to qualified RFPs with site-specific pricing within one business day.